| Facilities / Instruments | Tenure | Amount ( ₹ Crore) | Rating | Rating Action | Regulator |
|---|---|---|---|---|---|
| Fund Based | Long Term | 29.00 | BWR BBB - /Stable | Assignment | RBI |
| Non Fund Based | Short Term | 101.00 | BWR A3 | Assignment | RBI |
| Total | 130.00 | ||||
Brickwork Ratings (BWR) has assigned the long-term rating of BWR BBB- with a Stable outlook, and the short-term rating of BWR A3, for the bank loan facilities amounting to Rs. 130.00 crore of P&R Infraprojects Limited. The ratings reflect the company's established track record in primary structural steel projects in the EPC segment, reputed clientele, and a healthy unexecuted order book of Rs. 662.00 crore as of October 2026, providing strong medium-term revenue visibility. The 'Stable' outlook reflects BWR's expectation of steady operational performance, supported by strong revenue visibility, expected cost efficiencies from new fabrication capacity, and a moderate capital structure cushioned by subordinated quasi loans. These strengths are constrained by a moderate operating scale, profitability susceptible to elevated steel costs, working-capital-intensive operations with elongated inspection and certification cycles leading to high inventory and receivables, and moderate debt protection metrics. Going forward, the entity is expected to sustain its market position, execute its order book on time, and maintain its capital structure and debt-servicing capability, with liquidity further aided by Rs. 50.00 crore in subordinated unsecured loans that must be retained in the business as long-term funds and cannot be withdrawn during the loan tenure without the bank’s prior approval.
The terms of the sanction include standard covenants normally stipulated for bank loan facilities, with a specific condition stating that the Unsecured Loan is to be maintained in the business and not be withdrawn during the currency of the bank loan without permission.
| Analytical Approach | Comments |
|---|---|
| Applicable Rating Criteria | |
| Parent/Group/Government Support | NA |
|
Analytical Approach (Standalone) |
For arriving at its ratings, BWR has considered the standalone performance of P&R Infraprojects Ltd. BWR has applied its rating methodology as detailed in the Rating Criteria (hyperlinks provided above in this rationale). |
P&R Infraprojects Ltd has an established operating track record of more than two decades in the specialized steel structure, civil construction, and EPC segment, supported by experienced management and an established execution platform. The company is led by Promoter and Managing Director Mr. Paveljeet Singh Ruppal (B.Tech Mechanical), who brings decades of construction sector experience and oversees Finance, Technical, and Marketing. He is supported by Whole-Time Directors Mr. G.S. Ruppal (FIE (C), M.I.Struct.E (London), ME (M), NV, ABE, FICC, FICA), with around 4 decades of industry experience leading Technical and Projects, and Mrs. Pradeep Kaur Ruppal (M.Sc. Space Physics), who also brings decades of experience managing HR and Administration, alongside a team of qualified professionals. The company’s scale of operations moderated, with Total Operating Income (TOI) at Rs. 176.12 crore in FY26 from Rs.176.02 crore in FY25. Currently, FY26-27 states, the unexecuted order book of ~Rs. 662 crore as of Oct,2026 provides strong medium-term revenue visibility. This healthy pipeline is further supported by strategic capacity-building, specifically with a notable expansion in its in-house fabrication segment. This enhanced capacity optimizes EPC execution, strengthens the company's technical bidding profile, and makes it highly competitive in securing project awards from marquee government departments. Ultimately, PIPL’s owned equipment base, established clientele, and proven execution capabilities ensure the timely completion of complex infrastructure projects.
The company's financial risk profile remains moderate, supported by consistent internal accrual generation and strengthening of its capital base. TNW increased from Rs. 107.81 crore in FY24 to Rs. 113.19 crore in FY25 and further to Rs. 119.10 crore in FY26, primarily supported by profit retention. Despite the sustained scale of operations, total debt-to-TNW remained moderate at 0.37x in FY26, while TOL/TNW remained at 1.81x. The company has also demonstrated improvement in absolute profitability, with PAT increasing to Rs. 5.91 crore and net cash accruals to Rs. 10.86 crore in FY26.
The company's core operating profitability has declined, marked by noticeable margin contraction. This compression is primarily driven by escalating raw material costs (specifically steel and structural components), which now consume a significantly larger portion of the overall cost structure. Furthermore, the company's profitability remains sensitive to fluctuations in labor and sub-contracting costs. While these input pressures constrain margins, the risk is partially mitigated by the presence of price escalation clauses (for raw materials) in the majority of its contracts, which provide a degree of protection against severe cost shocks.
Operations remain highly working-capital-intensive. Systemic delays in government inspections and administrative project clearances have resulted in an elevated inventory build-up, driving up carrying costs and suppressing core margins. Furthermore, the receivables profile is heavily burdened by slow-realizing retention money both aged current retention funds and non-current funds locked during the Defect Liability Period. While core turnaround times are manageable, broader sectoral delays in project handovers and billings stretch the gross conversion cycle.
The company faces notable concentration risks on both geographical and operational fronts, although such trends are a common phenomenon within the EPC industry. Geographically, revenue generation remains heavily skewed toward northern India, with a single state driving a significant portion of total sales, followed by contributions from neighboring regions. While this exposes the company to regional concentration risk, its extensive operational experience in these specific terrains provides execution comfort. Furthermore, the increasing revenue share from other geographies reflects active and ongoing efforts to diversify the order book. Operationally, revenue recognition is severely back-ended, with the final quarter (Q4) of the financial year accounting for the majority of annual sales. This uneven, year-end heavy billing cycle typical of government infrastructure contracts exposes the firm to Q4 execution hurdles and realization risks.
Positive:
Improvement in the scale of operations while maintaining operating margins at current levels, with TOL/TNW remaining below 0.50x on a sustained basis, may lead to a positive rating action.
Negative:
A significant drop in revenue, an elongation in the working capital cycle, and the withdrawal of the Rs. 50 crore subordinated unsecured debt, along with a weakening capital structure with TOL/TNW exceeding 3.00x on a sustained basis, may lead to a negative rating action.
The entity's liquidity remains adequate, supported by free cash and cash equivalents of Rs. 0.55 crore as of March 31, 2026, and FY26 net cash accruals of Rs. 10.86 crore against Rs. 3.00–4.00 crore in debt repayments. Debt protection metrics remained comfortable in FY26, with an ISCR of 1.79x, DSCR of 1.42x, and a current ratio of 1.48x. Liquidity is further aided by Rs. 50.00 crore as subordinated unsecured loans, which, per the sanction terms and the entity’s undertaking, will be retained as long-term funds and cannot be withdrawn during the loan tenure without the bank’s prior approval.
The company demonstrates Adequate ESG profile based on its environmental, social, and governance practices.
Environmental: The company’s environmental performance is assessed through green building certifications, energy efficiency measures, and adoption of renewable energy sources like solar panels or green power, which is not applicable to the entity. Water management and waste reduction practices, including rainwater harvesting, wastewater recycling, and recycling/reuse of construction waste, are also important. Climate risk exposure and resilience measures, such as flood protection or heat-resistant materials, are evaluated. Compliance with environmental regulations and any history of violations or penalties are in line with the rules.
Social: Social considerations focus on workforce health and safety for both permanent and contractor staff, adherence to labour laws are compliant, safety performance, and training or human capital development programs. Diversity and inclusion are favourable, and community engagement initiatives, including local community programs, affordable housing, or livelihood support, are implemented, reflecting the company’s commitment to social responsibility.
Governance: Governance is supported by experienced promoters and escrow-backed structures that support financial discipline. However, the partnership structure leads to concentrated decision-making, and formal ESG committees and advanced governance disclosures are limited. Overall governance is adequate but can improve with greater formalization and transparency. Governance assessment considers board composition, risk management, and compliance.
| Industry Classification | |||
|---|---|---|---|
| Macro Economic Indicator | Sector | Industry | Basic Industry |
| Industrials | Construction | Construction | Civil Construction |
P&R Infraprojects Limited (PRIL) is a prominent engineering and civil construction firm specializing in the end-to-end design, fabrication, and erection of complex, heavy structural steelwork. Established in 1986 by Mr. Paveljeet Singh Ruppal as P&R Engineering Services before transitioning into a limited entity in 2005, the company is a proven contractor for large-scale infrastructure projects across India. PRIL focuses primarily on railway and road bridges, hydro and thermal power plants, and building structures. Presently, the company holds a robust market position with an active order book and project pipeline, serving as a preferred execution partner for tier-one clients such as Tata, Indian Railways, Sardar Sarovar Narmada Nigam Limited (SSNNL), Bharat Heavy Electricals Limited (BHEL), and the Border Roads Organisation (BRO).
| Standalone Financial Indicators (in ₹ crore) | Units | FY 23 - 24 (A) | FY 24 - 25 (A) | FY 25 - 26 (A) |
|---|---|---|---|---|
| Operating Revenue | Rs.Crs. | 248.70 | 176.02 | 176.12 |
| EBITDA | Rs.Crs. | 29.24 | 24.06 | 17.16 |
| PAT | Rs.Crs. | 8.16 | 5.38 | 5.91 |
| Tangible Net Worth | Rs.Crs. | 107.81 | 113.19 | 119.10 |
| Total Debt / Tangible Net Worth | Times | 0.38 | 0.36 | 0.37 |
| Current Ratio | Times | 1.35 | 1.41 | 1.48 |
|
* A:Audited UA:Unaudited P:Provisional PROJ:Projected
|
||||
|
Note: These are latest available financial results. All ratios as per BWR's calculations; Amount in ₹ crore
|
||||
| Current Rating (2026) | Rating History | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| 2025 | 2024 | 2023 | |||||||
| Facility / Instrument | Type | Amount ( ₹ Crore) |
Rating | Date | Rating | Date | Rating | Date | Rating |
| Fund Based | LT | 29.00 |
BWR BBB-/Stable
(Assignment) |
NA |
NA
|
NA |
NA
|
NA |
NA
|
| Non Fund Based | ST | 101.00 |
BWR A3
(Assignment) |
NA |
NA
|
NA |
NA
|
NA |
NA
|
| Grand Total | 130.00 | (Rupees One Hundred Thirty Crores Only) | |||||||
| Instrument / Facility | Complexity Indicator |
|---|---|
| Fund Based | Simple |
| Non Fund Based | Simple |
The Complexity Indicator refers to the ease with which the returns associated with the rated instrument could be estimated. It does not indicate the risk related to the timely payments on the instrument, which is rather indicated by the instrument's credit rating. It also does not indicate the complexity associated with analysing an entity's financial, business, industry risks or complexity related to the structural,transactional or legal aspects. Details on the complexity levels of the instruments are available on BWR's website Complexity Levels.
NON-COOPERATION WITH PREVIOUS CREDIT RATING AGENCY| Credit Rating Agency | Status and Reason for Non-Cooperation | Date of Press Release |
|---|---|---|
| IVR | Infomerics has downgraded and moved the rating on the long-term bank facilities & short term bank facilities of P&R Infraprojects Limited to the ISSUER NOT COOPERATING category because of lack of adequate information for rating review from the company and hence the uncertainty around its credit risk. | 14Apr2026 |
| Contacts | |
|---|---|
|
Analyst Team Contact
Niraj Kumar Rathi Senior Director Ratings niraj.r@brickworkratings.com Shalaka Shashikant Keer Analyst shalaka.k@brickworkratings.com |
Relationship Contact
Abhinandan Sarda Senior Director - Business Development abhinandan.s@brickworkratings.com Client Support clientsupport@brickworkratings.com |
| SL.No. | Name of Bank | Facilities | Tenor | Amount ( ₹ Crore) | Regulator |
|---|---|---|---|---|---|
| 1 | Punjab National Bank | Cash CreditSanctioned | Long Term | 24.00 | RBI |
| 2 | Punjab National Bank | Bank GuaranteeSanctioned | Short Term | 81.00 | RBI |
| 3 | State Bank Of India (SBI) | Bank GuaranteeSanctioned | Short Term | 20.00 | RBI |
| 4 | State Bank Of India (SBI) | Cash CreditSanctioned | Long Term | 5.00 | RBI |
| Total | 130.00 | ||||
| Name of the Instrument/Facility | Long Term/Short Term | ISIN | Date of Issuance | Coupon Rate (%) | Maturity Date | Size of the Issue ( ₹ Crore) | Rating Assigned and Rating Outlook th> | Regulator |
|---|---|---|---|---|---|---|---|---|
| Nil | Nil | Nil | Nil | Nil | Nil | Nil | Nil | Nil |
| Name of Entity | % Ownership | Extent of consolidation | Rationale for consolidation |
|---|---|---|---|
| Nil | Nil | Nil | Nil |
| A. | Rating activities | |
|---|---|---|
| SL.No. | Instrument / Activity | Regulator of the Instruments |
| 1 | Listed/Proposed to be listed bonds/debentures/preference share (all securities) | SEBI |
| 2 | Unlisted/Proposed to be unlisted Bonds/Debentures/ Preference share (all securities) | MCA |
| 3 | Listed PTCs / Securitisation Notes (originated by entities regulated by RBI)* $ | RBI |
| 4 | Listed PTCs / Securitisation Notes (originated by entities not regulated by RBI)* | SEBI |
| 5 | Unlisted PTCs / Securitisation Notes (originated by entities regulated by RBI)* | RBI |
| 6 | Listed Commercial Paper and NCDs with original maturity less than 1 year | RBI |
| 7 | Unlisted Commercial Paper and NCDs with original maturity less than 1 year | RBI |
| 8 | Loan Facilities (Fund/Non-Fund Based) from Bank/NBFCs/NHB/FIs^ | RBI |
| 9 | External Commercial Borrowings and other similar borrowings | RBI |
| 10 | Certificates of Deposit | RBI |
| 11 | Fixed Deposits raised by NBFCs,HFCs, FIs | RBI |
| 12 | Fixed Deposits raised by corporates other than NBFCs, Banks, HFCs, FIs | MCA |
| 13 | Inter Corporate Deposits/Loans extended by Corporates | MCA |
| 14 | Borrowing programme ~ | - |
| 15 | Issuer Ratings # | - |
| 16 | Credit Ratings for Capital Protection Oriented Schemes (by Mutual Funds and AIFs) | SEBI |
| 17 | Credit Quality Ratings (CQR) for Mutual Fund Schemes and Schemes of AIFs | SEBI |
| 18 | Listed Security Receipts $ | RBI |
| 19 | Unlisted Security Receipts | RBI |
| 20 | Independent Credit Evaluation (ICE) | RBI |
| 21 | Expected Loss Ratings (Listed/Proposed to be listed bonds/debentures/preference share (all securities)) | SEBI |
| 22 | Expected Loss Ratings (Unlisted/Proposed to be unlisted Bonds/Debentures/ Preference share (all securities)) | MCA |
| 23 | Unlisted PTCs / Securitisation Notes (originated by entities not regulated by RBI) * | Investor-side regulator such as IRDAI, PFRDA @ |
* Includes securitisation transactions involving assignee payout, acquirer's payout.
~ The rated instrument may involve issuance of different instruments such as debt securities (listed or otherwise), bank loans,
commercial paper (listed or otherwise), etc. The regulator of the instrument may accordingly be SEBI, RBI or MCA and can only be
determined upon issuance. In PRs subsequent to issuance(s), Brickwork Ratings India Private Limited (BWR) shall separately capture the rated quantum
details along with names of respective regulators.
^ Includes bank facilities such as liquidity facility, second loss facility that are part of securitisation transactions.
# There is no instrument being rated and hence, Regulator of the Instrument is not applicable. The rating scale and definitions are
being followed as stipulated in SEBI Master Circular for CRAs.
@ These ratings were assigned during regulatory regime prior to introduction of SEBI CRA Circular dated Feb 10, 2026 and the
investor side regulators have accordingly been included.
$ By virtue of the instrument being listed, SEBI acts as the regulator for listing and related issues.
Note: Kindly note that for activities or instruments falling under the purview of FSRs other than SEBI, the grievance/dispute
redressal mechanisms and investor protection mechanisms provided by SEBI shall not be available.
| B. | Other Activities | Regulator of the Instruments |
|---|---|---|
| 1 | Monitoring Agencies | SEBI |
| 2 | Research activities incidental to rating such as research for Economy, Industries and Companies * | NA |
BWR Board of Directors have no influence over rating decisions, nor do they sit on the rating committee or review, discuss or evaluate any credit rating during the Board meetings.
About Brickwork Ratings
Brickwork Ratings (BWR), a Securities and Exchange Board of India [SEBI] registered Credit Rating Agency and accredited by Reserve Bank of India [RBI]. BWR is the 5th agency to get a credit rating registration in India in 2009 and its corporate office in Bengaluru. It has a country-wide presence with representatives in 150+ locations. Canara Bank is an institutional investor in Brickwork.
Brickwork offers credit ratings of Bank Loan, Non- convertible / convertible / partially convertible debentures and other capital market instruments and bonds, Commercial Paper, perpetual bonds, asset-backed and mortgage-backed securities, partial guarantees and other structured / credit enhanced debt instruments, Security Receipts, Securitisation Products, Municipal Bonds, etc. BWR has also rated NGOs, Educational Institutions, Hospitals, Urban Local Bodies and Municipal Corporations.
Nature of Ratings & Information: BWR ratings are opinions on the relative ability of an entity/instrument to meet its financial obligations and are based on information obtained from issuers and other sources believed to be reliable. BWR does not conduct audits, due diligence, or independent verification of such information and does not guarantee its accuracy, adequacy, or completeness.Ratings are current only as of the date of publication and may be revised based on new or unavailable information.
No Advice or Recommendation: Ratings, reports, and related communications are not investment advice and do not constitute recommendations to buy, sell, or hold securities, or to sanction, renew, or disburse credit facilities. They do not represent offers or solicitations for any transaction. Users must rely on their own independent judgment and professional advice. Access to or use of these materials does not create any client relationship with BWR.
Liability, Usage & Regulatory Framework: This content is published for the purpose of dissemination of information as required under applicable laws and regulations. BWR holds exclusive copyright over the content. It may be used with appropriate credit to BWR, provided that the content is not altered or modified in any way that could change its meaning or intent. BWR retains the exclusive right to distribute or share its rating rationales, directly or indirectly, through any print, digital, or electronic media. All reports are provided on an "as is" basis without warranties of any kind, express or implied, including but not limited to merchantability, fitness for a particular purpose, or non-infringement. BWR and its affiliates shall not be liable for any direct, indirect, incidental, or consequential losses or damages arising from the use of these reports. Ratings are subject to continuous surveillance and may be revised, suspended, or withdrawn at any time without notice. These reports are intended for use within India only. BWR operates under SEBI Regulations and Code of Conduct.
For more information on policies and ratings, please visit our www.brickworkratings.com